Serving Rialto, CA and surrounding areas.(909) 271-0773
Bridge City Rialto Concrete

Concrete Contractor in Rialto, CA

Driveways, garage floors, walls and warehouse slabs, poured on Lytle Creek fan ground that runs coarse in the north and fine in the south. The figure is measured at your door before a date is set.

Google reviewsFacebook reviewsBetter Business Bureau reviews5.0 Our rating from customers · Google, the BBB and Facebook
New concrete driveway at a home off Riverside Avenue in Rialto

The Concrete Work This Crew Does in Rialto

Bridge City Rialto Concrete pours for a city that has been building since 1911 and has not stopped: pre-war blocks either side of the Riverside Avenue downtown, tract streets from the 1960s through the 1980s, and a north end raised on the old municipal airport after it closed in 2014. A garage floor taken out and repoured, a walk mended on the Route 66 run of Foothill Boulevard, a dock slab behind a distribution unit: all of it to California code.

A newly poured concrete driveway at a single family home in Rialto

Concrete Driveway Building

Worried about alluvial wash settling? We dig out unstable cobble and pour 4 inches of 4,000 PSI concrete over 4 inches of compacted rock.

Broom finish concrete patio behind a single family home in Rialto

Concrete Patio Construction

Will desert wind crack your patio slab? We pour four inch slabs over four inches of rock base with control joints cut every eight feet.

Ashlar slate stamped concrete patio at a single family home in Rialto

Stamped Concrete Services

Worried hot winds will crack decorative slabs? We pour 4000 PSI mixes at 4 inches thick with integral color and saw cuts at 10 foot spans.

Concrete sidewalk building on a residential property in Rialto

Concrete Sidewalk Building

Are Rialto walk slabs tipping at your curb line? We pour 4 inch 3000 PSI concrete over 4 inches of compacted base with dowelled joints.

Finished smooth concrete garage floor inside a suburban Rialto home

Garage Floor Concrete

Is your garage floor sinking under heavy truck parking? We pour four inches of concrete over four inches of crushed base with steel rebar.

Stamped ashlar slate patio behind a single family home in Rialto

Decorative Concrete

Worried about pattern cracking? We pour 4 inches of 4000 PSI mix with integral colour and cut joints into stamp lines within 12 hours.

Concrete retaining wall holding a terraced yard at a Rialto home

Concrete Retaining Walls

Sloping yard washing out? Poured concrete walls keyed 18 inches into stable grade with rebar and gravel backfill hold Rialto banks steady.

A freshly poured interior concrete floor inside a Rialto workshop

Concrete Floor Installation

Struggling with cracked interior pads? We pour four-inch slabs over compacted class two base with ten-mil barriers to stop damp ground.

Broom finished concrete pool deck around a backyard pool in Rialto

Concrete Pool Decks

Is your pool surround cracking along the coping? We pour 4-inch slabs over 4 inches of crushed rock with expansion joints every 10 feet.

New concrete steps poured at a single family home in Rialto.

Concrete Steps Construction

Are your entrance steps pulling away? We excavate footings to 12 inches and pin rebar directly into your foundation to stop movement.

Poured concrete slab foundation for a residential garage in Rialto

Slab Foundation Building

Need a slab that will not crack on loose wash soil? We pour monolithic pads with twelve inch perimeter footings and four inch slab depth.

Concrete foundation footings dug at a single family Rialto home

Foundation Installation

Is your slab cracking from loose wash rock? We excavate unstable cobble and pour 3000 PSI concrete across a 6 inch crushed aggregate base.

Poured concrete parking lot on a commercial retail property in Rialto

Concrete Parking Lot Building

Need a commercial lot that resists freight axle loads? We pour six-inch slabs with four-thousand PSI mix and compacted crushed stone bases.

Trench inspection with steel rebar for a house footing in Rialto

Concrete Footings

Worried about foundation shifting in sandy wash soils? We dig footings 18 inches down with Grade 60 rebar cages for permanent stability.

Foundation raising under an unlevel residential home slab in Rialto

Foundation Raising

Has your slab dropped unevenly? We drive steel piers and inject structural grout to lift settled foundations 4 inches back to level grade.

Diamond saw cutting an expanded driveway slab in Rialto

Concrete Cutting

Need clean slab cuts through hard river rock? We wet saw slabs up to 8 inches deep using commercial diamond blades to prevent edge spalling.

Four Steps From Your Call to the Cure

Rafael Ocampo picks up the phone, measures the lot at step two and stands over the pour at step three, so the man who wrote the number is the man who owns it.

1

Ring or Write In

Ring the office or fill in the form. Someone answers within 1 business day and books the free measure for a day in that same week.

2

Measure and Write

We read the fall, open the ground and see what is beneath it, then split the price into demolition, base, pour, finish and clearing up.

3

File It, Then Pour

With the figure agreed the permit goes in, a crew date is set and the job runs: strip out, base, forms, pour, finish, joints.

4

Walk the Slab

The site is cleared and the finished slab walked against your estimate - depth, base, joints, finish - before the job is closed off.

What Rialto Homeowners Get From This Crew

The C-8 and the Insurance

Concrete is the C-8 classification, held with the California Contractors State License Board and searchable there under the business name. liability insurance on every job follows the crew, so a back patio off Willow Avenue and a dock slab on the north end are covered the same way.

Rialto Work Since 2016

Rafael Ocampo opened the business in 2016 with 20 years already spent on the Inland Empire crews. What the Building & Safety counter on South Palm Avenue wants to see, and where the wash cobble gives way to fine sand, are things he learned street by street.

The Visit and the Figure Are Free

Nothing is charged for coming out. On a Rialto lot the first thing opened is the subgrade, because a buried grove line under the surface decides the base long before the finish does. Demolition, base, pour, finish and clearing up are then priced apart.

Put in Writing Before You Sign

Every job leaves with a written workmanship guarantee against defects in how it was built. The call-back here is a panel dropped where a soft trench was left in, and that one is ours to put right. Weather and ordinary use are not.

Rather ask something first? (909) 271-0773 or send us a message.

In Their Own

Rialto Customers on the Work

Three jobs from the past two years, written up by the customers themselves: a drive in the older streets south of Baseline, a unit floor on the north end and a walk on Foothill Boulevard.

Google review

“Our drive off Eucalyptus Avenue was 1970s work and had broken into six pieces. They lifted 540 square feet, screened the cobble out of the base going back and laid five inches. Rafael was here at seven and sawed the joints before he left.”

Facebook review

“Our unit on the north end needed a floor we could run pallet jacks across. They broke out the old one, laid a sealed sheet under the new pour and finished 1,800 square feet flat. Eighteen months of forklifts on it and it has not dusted once.”

BBB review

“The public walk in front of our shop on Foothill had lifted at a street tree and the city had written to us about it. They pulled the permit, sawed four panels out square, barriered the root and repoured. It passed inspection first time.”

Crew troweling the surface of a new slab at a Rialto home
20Years on crews before 2016
20Cities this crew covers

About Bridge City Rialto Concrete

C-8 Licensed, Working Out of North Riverside Avenue

Bridge City Rialto Concrete is a concrete contractor owned here and worked from here, out of 1550 North Riverside Avenue. Rafael Ocampo opened it in 2016 after 20 years on the Inland Empire crews, and the jobs run from a single garage floor to a commercial slab, across 20 cities in three counties.

Rialto voted itself a city in 1911, twenty-four years after a Kansas colony bought the land off the water company and planted citrus on it. The median house here dates to 1982, which puts most of the drives, walks and garage floors coming out now at the far end of the 30 to 40 years a properly poured slab gives.

The classification is C-8 Concrete, registered with the California Contractors State License Board. We carry liability insurance on every job. Permits go in at the city Online Permit Center, and one of us meets the inspector inside the window the city books. Every estimate is measured and written on site.

Get a Free Estimate

The Build

The Eight Things That Do Not Change in Rialto

The size of the job changes nothing here. What sits under the slab is dug out and proved, base is rolled in layers, depth follows what will stand on it, and the joints are sawn before the crew goes home.

Get a Free Estimate
  • Subgrade dug and proved
  • Wash cobble screened out
  • Base rolled in layers
  • Depth follows the load
  • 3,500 psi ready-mix
  • Joints sawn day one
  • Edge work done by hand
  • Wet for the full week

Concrete This Crew Has Poured in Rialto

Six jobs on streets you already use - a drive south of Baseline, a floor in a north-end unit, a walk on the Foothill Boulevard stretch. Any of them is a short detour to go and look at.

Rafael Ocampo, who owns Bridge City Rialto Concrete, on a Rialto job

Rafael Ocampo - Founder and Owner

Rafael Ocampo gave 20 years to other outfits before he opened Bridge City Rialto Concrete in 2016 - tract drives in the streets south of Baseline, unit floors on the north end, frontage walks along the Route 66 stretch of Foothill Boulevard. He holds the C-8 himself, lives in Rialto, measures every estimate and stands the pour.

More About Us
Rialto crew forming up a driveway on a residential street

The City Itself

Rialto, Street by Street and Under It

A city dating from 1911, ground that changes grade by grade across the Lytle Creek fan, and a permit counter with hours of its own: each one shows up on the estimate.

Rialto voted to incorporate on 31 October 1911, twenty-four years after a Kansas colony bought the land and planted citrus on it. Route 66 came down Foothill Boulevard in 1930, and the frontage walks along that run have been patched by hand since. The tract streets went in from the 1960s through the 1980s, which is why the median house here dates to 1982. The north end is newer than any of it: the municipal airport closed in 2014 and Renaissance Marketplace went up on the runway ground.

All of it is Lytle Creek fan. The creek came out of the San Gabriels and spread granite cobble, gravel and sand south across what is now the city, so the material coarsens toward the wash on the east side and fines out toward the county line. Boulders sit under drives on the north end with nothing on the surface to say so, and the citrus rows that came before the tracts left buried pipe and graded lanes that go on settling. Which parcel is which is set out on the USDA Web Soil Survey.

Building & Safety sits in the Development Services Department at 150 South Palm Avenue, the counter runs 7 AM to 5:30 PM on weekdays, and applications go in through the Online Permit Center. Curb, parkway and public walk are right-of-way, and take an encroachment permit from Engineering Services in Public Works. County flood control also runs the Rialto Channel and the Cactus basins at Baseline and Cactus Avenue, so a lot draining toward either wants its fall set before the forms go in.

What to Lay on a Rialto Driveway

Rialto parks work trucks and trailers on residential frontages all week, and the ground beneath them is fan material that settles in patches rather than evenly. Between those two the choice mostly makes itself.

OptionLifespanBack in useUpkeepOn Rialto fan ground
Poured concrete30-40 yearsFoot traffic 24-48 hrs, cars at 7 daysSealed again every 2-3 yearsRigid over a soft patch; the joints take the movement
Asphalt paving15-20 yearsBack under a car in 2-3 daysSealcoated on the same 2-3 yearsGoes soft over 100 degrees and dents under a jack
Interlocking pavers25-50 years if the base is rightUsable the day it is laidJoints re-sanded every 1-2 yearsTakes the movement, but sinks one paver at a time

Asphalt is the cheapest to lay and the dearest to keep. Pavers invert that, and want resetting wherever a patch has dropped. Concrete sits between the two.

Six Things Rialto Lots Teach You About Concrete

Why does wind off the Cajon Pass matter on a pour?

Because moving air lifts water off a fresh surface faster than heat on its own does, and the top crusts before the slab beneath it has strength. Rialto sits at the mouth of the pass, so wind is a working condition here rather than a bad day. We pour early and keep the surface wet.

Why does the wash cobble have to come out of a base?

Because a rounded stone has nothing to grip, so a base built over it drops as the stones roll under load. Lytle Creek laid that cobble thickest across the north of the city and thinner going south, so how much has to be screened out changes street by street. It goes out either way.

What do old grove lines do under a new slab?

They leave a soft line the surface never shows. Rialto was citrus before it was tract housing, and the rows carried buried pipe and graded service lanes between them. Backfilled loose, those lines settle for decades, so we open the ground first and dig them out before base goes in.

Where does a crack end up if the joints are right?

In the joint. Curing concrete shrinks and has to part somewhere, so a groove is sawn every 2 to 3 feet for each inch of depth and the crack takes that line. Where the fan runs patchy the grooves go closer together, since the ground below shifts further than the slab across it.

Which counter in Rialto issues a concrete permit?

Building & Safety, in the Community Development Department at 150 South Palm Avenue, open 7 AM to 6 PM on weekdays, with applications filed through its Online Permit Center. Work in the right-of-way goes to Engineering Services in Public Works instead.

How deep does a slab go for what stands on it?

The load decides, never the area. Feet and cars want 4 inches; a truck, a trailer or a forklift wants 5 to 6, and Rialto keeps plenty of all three at home. Depth is the single figure no repair recovers afterwards, which is why the number you are buying is on the sheet.

Concrete Questions Asked in Rialto

Cost, depth, base, joints, sealing, permits, timing and what the guarantee covers - answered for wash ground, old grove lines and a city that has been building since 1911.

(909) 271-0773
  • How much does concrete cost in Rialto, CA?

    Nobody can price it off a description, and depth moves the total before area does: one more inch on a 4-inch slab means a quarter again in concrete and more rock under it. Then comes how much old surface leaves, what the subgrade turns out to be, and the finish. Those four are measured free and set down in writing.

  • What makes one Rialto driveway dearer than another?

    What is under it, and how much of the old one has to leave. A 1970s drive on north-end cobble is a different dig from a 1990s frontage on fine sand near Merrill, and a grove line beneath either adds a day of excavation. The dig and the base carry that difference, and each is its own line.

  • What moves the number on a Rialto patio?

    Area, the way in and the finish, over a 4-inch slab on compacted base. The way in is what swings it on the tract streets: a side gate a buggy passes through is one job, and a yard reachable only through the house is barrows, which is labor and not material. A stamp or a color wants an extra day to seal.

  • How deep should a Rialto driveway be poured?

    4 inches under cars, 5 to 6 under a truck, a trailer or an RV - and homes here keep all three on the frontage. Getting the depth right costs little at the pour and cannot be bought back later: a slab an inch shy will crack under everyday use within a few years. The number is on your estimate before anything is signed.

  • Is the base more important than the concrete?

    Yes, and most failures start under the slab rather than in it. Angular rock compacted in layers carries the load across and drains the underside. Raw fan material does neither on its own, because a rounded stone rolls away from pressure, so it is screened out and graded base is laid in its place.

  • What do the sawn grooves in a slab do?

    They choose where it cracks. A curing slab shrinks and has to open somewhere, so grooves go in every 2 to 3 feet for each inch of depth, and the crack runs along one instead of wandering across the surface. Patchy subgrade gets closer spacing, because what is below moves further than the concrete on top.

  • What does Rialto ground do to a slab left on it?

    It settles unevenly beneath one. The city lies on the Lytle Creek fan, coarse and bouldery toward the wash on the east side and finer sand running south, with old grove lines and fill through both. Poured straight onto that, a slab spans the soft parts until it breaks over one. The parcel-level survey is the USDA Web Soil Survey.

  • Which months suit a pour in Rialto best?

    November to April, when afternoons stay mild and only the wind is taking water off the surface. Above 95 degrees the top skins over before the slab beneath has strength. Summer pours still go ahead, started before 8 AM and kept damp through the seven-day cure the American Cement Association describes.

  • Does a slab in Rialto need sealing, and how often?

    Yes, on a 2 to 3 year cycle, and sooner where afternoon sun is full on it or a work truck stands on it. Untreated concrete takes liquid in, so oil and water leave a mark that does not lift. Inland ultraviolet also takes the color out of stamped and pigmented finishes quicker than it does at the coast.

  • How long is the crew on site for a job?

    3 to 5 working days for a normal house job, and then the concrete has to cure. In the older streets the demolition and the dig usually take the first two of those, which is the part that moves most. Walk on it after 24 to 48 hours, park on it at 7 days, put weight on it at 28.

  • Does a new drive or patio need a permit?

    Within your own lot line, usually not for a driveway or walk under 30 inches above grade. The code's list never names a patio slab, so that one we read against the counter's own before booking. In the right-of-way - the approach, the parkway, the public walk - an encroachment permit comes from Engineering Services in Public Works, and a wall above 4 feet is a building permit from Building & Safety.

  • Is the work guaranteed once the crew has gone?

    Yes. Every job carries a written workmanship guarantee against defects in how it was built, with the terms on the estimate you sign. What it covers is what we controlled: the dig, the base, the depth, the joint spacing and the finish. Marks from use, and ground moving further than the joints were cut for, are named as excluded on the same sheet.

Where We Work

Towns Covered From Riverside Avenue

Rialto is home, and the work has taken us out across the Inland Empire from it. The towns below are the ones we know best - their older streets, the ground under them, the counters we file at. Find yours, or call and we will say whether we can come out.

Show All Areas We Serve

Map showing the office on North Riverside Avenue in RialtoOpen the Rialto Office in Google Maps
Bridge City Rialto Concrete

A Free Estimate, Measured Where the Job Is

Ring or leave the form and an answer comes within 1 business day. Rafael Ocampo drives out himself, reads the fall, opens the ground and writes the figure at your property - nothing here is priced off a photograph.

Request a Free Estimate

Written on site · No obligation

By submitting, you agree to our disclosure and consent terms, including being contacted by Bridge City Rialto Concrete.